Case study · White paper
Single-pass welding in wind-tower construction
How tower sections can be joined in a single pass instead of many submerged-arc passes — and what that changes in welding time, consumables and energy. Free PDF, in English or German.
What the case study covers
- The baseline: wind-tower sections joined by multi-pass submerged-arc welding — where time, filler wire, flux and energy go.
- The single-pass approach: laser-hybrid welding with a contactless magnetic weld pool support, through the full plate thickness in one pass.
- Joint preparation: why a flame-cut edge is sufficient and the groove preparation can be dropped.
- The effect: welding time, consumables, energy and CO₂ compared for the same component.
Request the case study
We send the PDF to you personally by email — choose English or German.
Thank you.
We will send you the English case study by email shortly.
We will send you the German case study by email shortly.